Sl. |
Project title |
Ministry Name |
Start Date |
End Date |
1 |
Establishment of Bangabandhu Medical College and Hospital, Sunamganj |
Health and Family Welfare |
01-11-2018 |
30-06-2021 |
2 |
ESTABLISHMENT OF 500-BEDED HOSPITAL & ANCILLARY BUILDINGS IN JESSORE, COX’S BAZAR, PABNA AND ABDUL MALEK UKIL MEDICAL COLLEGE (AMUMC) AND JONONETA NURUL HOQUE ADHUNIK HOSPITAL, NOAKHALI |
Health and Family Welfare |
01-07-2018 |
30-06-2021 |
3 |
Expansion of National Institute of Neuro-Sciences & Hospital (01 January 2018 - 31 December 2020) |
Health and Family Welfare |
01-01-2018 |
31-12-2020 |
4 |
Establishment of Patuakhali Medical College and Hospital, Patuakhali (01/07/2016 - 30/06/2020) |
Health and Family Welfare |
01-07-2016 |
30-06-2020 |
5 |
Establishment of Jamalpur Medical College and Hospital & Jamalpur Nursing College, Jamalpur (01/07/2016 - 30/06/2019) |
Health and Family Welfare |
01-07-2016 |
30-06-2019 |
6 |
Establishment of Kustia Medical College (01/01/2012-31/12/2019) approved |
Health and Family Welfare |
01-12-2012 |
19-12-2019 |
7 |
Shaheed M Monsur Ali Medical College and 500 Bedded Medical College Hospital, at Sirajganj. (01/07/16 - 30/06/19) |
Health and Family Welfare |
01-07-2016 |
30-07-2020 |
8 |
Establishment of Colonel Maleque Medical College & 500 bedded Hospital, Manikgonj (01/07/15 - 30/06/21) |
Health and Family Welfare |
01-07-2015 |
30-06-2021 |
9 |
Establishment of Tangail Medical College & Extension of 250 Bedded General Hospital in 500 Bedded Medical College Hospital, Tangail. (01/07/16 - 30/06/19) |
Health and Family Welfare |
01-07-2016 |
30-06-2019 |
10 |
Sheikh Lutfar Rahman Dental College at Gopalgonj (01/01/2014-31/12/2020 |
Health and Family Welfare |
01-01-2014 |
31-12-2020 |
11 |
Extansion Project of Seikh Abu Naser Hospital at Khulna (01/07/2012-31/12/2019) approved |
Health and Family Welfare |
01-07-2012 |
31-12-2019 |
12 |
Establishment of Shaheed Sayed Nazrul Islam Medical College and Hospital, Kishoreganj (01/07/2012 - 30/06/2018) |
Health and Family Welfare |
01-07-2012 |
31-12-2018 |
13 |
Establishment of National Institute Of Digestive Disease Research and Hospital (01/09/11-30/06/2018) approved |
Health and Family Welfare |
01-09-2011 |
31-12-2019 |
14 |
Extension of National Institute of Traumatology and Orthopedic Rehabilitation (1st Revised) (01/07/2013-30/06/2018 |
Health and Family Welfare |
01-07-2013 |
30-06-2019 |
15 |
Establishment of Universal Nursing Institute (01/07/2017-31/12/2019) |
Health and Family Welfare |
01-07-2017 |
31-12-2019 |
16 |
Establish 150-bed cardiovascular unit at the National Heart Foundation |
Health and Family Welfare |
01-01-2019 |
31-12-2021 |
17 |
Construction of Multipurpose Residential Flat at Hospital Zone Motijheel Colony (01/09/2017-30/06/2020) Approved |
Housing and Public Works |
01-09-2017 |
30-06-2020 |
18 |
Construction of 456 nos Govt. Residential Flats at Malibag, Dhaka (01/01/16 - 30/06/2020) |
Housing and Public Works |
01-01-2016 |
30-06-2020 |
19 |
Construction of Multistoried Building for Government Offices in Madaripur (01/01/2016 - 30/06/2020) |
Housing and Public Works |
01-01-2016 |
30-06-2020 |
20 |
Construction of 288 nos Govt. Residential Flats for PWD Officers at Section-6, Mirpur, Dhaka (01/01/2016 -30/12/2019) |
Housing and Public Works |
01-01-2016 |
31-12-2019 |
21 |
Construction of 672 residential flats in 8 15-storey buildings for government officials in Narayanganj Aliganj. |
Housing and Public Works |
01-01-2016 |
30-06-2025 |
22 |
Construction of 288 nos. Govt. Residential Flat (PWD & Dept. of Architect) at Zigatola Colony) (01/09/2017-30/06/2020) Approved |
Housing and Public Works |
01-09-2017 |
30-06-2020 |
23 |
Construction of Multi storied Govt. Officer Building in Gopalgonj |
Housing and Public Works |
01-09-2017 |
30-06-2024 |
24 |
Construction of Residential building for Government officer/staffs at Noakhli Sadar. |
Housing and Public Works |
01-01-2018 |
30-06-2020 |
25 |
Internal repair and renovation of cafeteria and various halls at Prime Minister's office. |
Housing and Public Works |
01-02-2018 |
30-06-2019 |
26 |
Construction of Govt. Officer’s Quarter at Azimpur Colony, Dhaka (Phase-2) (01/07/2017-30/06/2020) Approved |
Housing and Public Works |
01-07-2017 |
30-06-2020 |
27 |
Infrastructural development of Ramna Park at Dhaka and overall beautification including Ramna Lake (01/10/2018 - 31/12/2020) Approved |
Housing and Public Works |
01-10-2018 |
31-12-2020 |
28 |
Modernization of Osmani Memorial Auditorium (01/09/2018-30/06/2020) Approved |
Housing and Public Works |
01-09-2018 |
30-06-2020 |
29 |
Development of two mos. Of Park with Modern Facilites & one Play Ground of PWD’s land at Cox’s Bazar |
Housing and Public Works |
01-10-2017 |
31-12-2023 |
30 |
Construction of 2 nos. Residential Bhaban in premises of Prime Minister’s Office at Tejgaon. |
Housing and Public Works |
01-09-2017 |
30-06-2020 |
31 |
Construction of Govt. Residential flat and Dormitory at Abandon House in Chattogram. |
Housing and Public Works |
01-02-2017 |
30-06-2025 |
32 |
Construction of 288 nos. Govt. Residential Flat (PWD & Dept. of Architect) at Zigatola Colony) (01/09/2017-30/06/2020) Approved |
Housing and Public Works |
01-01-2018 |
31-12-2020 |
33 |
Construction of multi storied residential flat for government officer/staff at Tejgaon, Dhaka (13 storied). |
Housing and Public Works |
01-07-2018 |
30-06-2020 |
34 |
Accommodation for Judicial Officers at Azimpur, Dhaka, (01/07/2016-30/06/2020) Approved |
Housing and Public Works |
01-08-2016 |
30-06-2021 |
35 |
Construction of 684 flat at 9 multi storied building replacing 11 abandoned buildings at CGS colony in Agrabad, Chattogram (01/07/2018-30/06/2020) Approved |
Housing and Public Works |
01-07-2018 |
30-06-2020 |
36 |
Construction of 398 nos Govt. Residential Flats (20 nos. Building) at 20 nos . Abandoned House in Gulsan, Dhanmondi & Mohammadpur, Dhaka; |
Housing and Public Works |
01-07-2016 |
30-06-2025 |
37 |
Modernization of important electrical/ mechanical systems of Prime minister’s office and Gonobhaban (01/07/2018-30/09/2019) Approved |
Housing and Public Works |
01-07-2018 |
30-09-2019 |
38 |
Construction of multi-storied residential building for government officials at Azimpur Government Colony in Dhaka (Zone-A) |
Housing and Public Works |
01-01-2019 |
31-12-2024 |
39 |
Construction of residential flats for government officials/employees in 36 abandoned houses of Chittagong. |
Housing and Public Works |
01-09-2018 |
30-06-2025 |
40 |
Construction of 20 storied new office building at Bangladesh Secretariat |
Housing and Public Works |
01-01-2019 |
30-06-2024 |
41 |
Construction of Residential flats for Government officers at Mirpur-6, Dhaka. |
Housing and Public Works |
01-01-2018 |
31-12-2020 |
42 |
Construction of multi-storied government office building in Sher-E-Bangla Nagar administrative area of Dhaka. |
Housing and Public Works |
01-01-2024 |
31-12-2026 |
43 |
Construction of 123 flats for government officials and employees in Tejgaon industrial area of Dhaka. |
Housing and Public Works |
01-01-2024 |
31-12-2026 |
44 |
Other modernization works including construction of residential building for officers at Gate No. 03 of Bangabhaban and store house adjacent to Deer Park. |
Housing and Public Works |
01-12-2023 |
31-12-2025 |
45 |
Construction of Rashtriya Guest House at Plot No. 1, Road No. 84, N-E(M) Block, Gulshan. |
Housing and Public Works |
01-01-2024 |
31-12-2025 |
46 |
Construction of necessary infrastructure (1st phase) to expand the facilities for visitors to the tomb complex of Father of the Nation Bangabandhu Sheikh Mujibur Rahman at Tungipara in Gopalganj district. |
Housing and Public Works |
01-12-2023 |
30-06-2025 |
47 |
Modernization of Mirpur Shahid Intellectual Memorial in Dhaka. |
Housing and Public Works |
01-11-2023 |
31-10-2024 |
48 |
Acquisition of land for the expansion and development of the existing facility with the aim of increasing the facilities of visitors to the tomb of Father of the Nation Bangabandhu Sheikh Mujibur Rahman in Tungipara of Gopalganj district. |
Housing and Public Works |
01-10-2023 |
31-10-2024 |
49 |
Father of the Nation Bangabandhu Sheikh Mujibur Rahman Social Centre/Park, Tarakanda, Mymensingh. |
Housing and Public Works |
01-07-2023 |
30-06-2026 |
50 |
Construction and electrical modernization of Toshakhana, Durbar Hall, Cabinet Hall, Kitchen and Shelter House among other places inside Banga Bhavan. |
Housing and Public Works |
01-04-2023 |
31-12-2024 |
51 |
Construction of 112 residential flats for government officials of Bangladesh Parliament Secretariat at Agargaon, Dhaka. |
Housing and Public Works |
01-01-2023 |
31-12-2025 |
52 |
Bangladesh Jatiya Sangsad Bhavan area including electrical-mechanical and security system and other development works. |
Housing and Public Works |
01-10-2022 |
30-09-2024 |
53 |
Development of UN green garden with modern facilities in Panchlaish residential area of Chittagong district. |
Housing and Public Works |
01-07-2022 |
30-06-2024 |
54 |
Modernization of Special Security Force (SSF) firing ranges. |
Housing and Public Works |
01-01-2020 |
30-06-2024 |
55 |
Construction of multi-storied residential flats for government officials and employees at Mirpur Paikpara in Dhaka. |
Housing and Public Works |
01-10-2019 |
31-12-2024 |
56 |
Construction of multi-storied building in campus of Officers Club, Dhaka. |
Housing and Public Works |
01-07-2019 |
30-06-2025 |
57 |
Modernization and upward expansion of Sobhan Bagh Mosque in Dhaka. |
Housing and Public Works |
01-03-2019 |
31-12-2023 |
58 |
Building protection projects in urban areas. |
Housing and Public Works |
01-01-2016 |
31-12-2025 |
59 |
Development and Revenue |
Housing and Public Works |
|
|
60 |
Reconstruction of Cumilla Central Jail. |
Home Affairs |
01-01-2019 |
31-12-2021 |
61 |
Construction of 09 residential Tower Building in Dhaka Metropolitan Area |
Home Affairs |
01-11-2018 |
30-06-2021 |
62 |
Construction of 9 residential tower buildings for Bangladesh Police at different Places of the Country. |
Home Affairs |
01-11-2018 |
30-06-2021 |
63 |
Construction of Armory for 19 Districts (1st RDPP) |
Home Affairs |
07-01-2015 |
30-06-2018 |
64 |
Construction of RAB Head Quarter Building |
Home Affairs |
01-01-2018 |
30-06-2021 |
65 |
Establishment of Five RAB complex and a RAB Training School (1st RDPP) |
Home Affairs |
01-01-2013 |
30-06-2020 |
66 |
Vertical Extension of NCCOM Builidng for Modernization and Strengthening of Bangladesh Police. |
Home Affairs |
01-01-2018 |
30-06-2020 |
67 |
Construction of Residential Quarter for Senior Officers of Bangladesh Police. |
Home Affairs |
01-11-2018 |
30-06-2020 |
68 |
Construction of 101 Dilapidated Thana Building in Type Plan for Police Department (1st RDPP) |
Home Affairs |
07-01-2012 |
30-06-2019 |
69 |
Construction of Counter-terrorism and Transnational Crime Prevention Center for Bangladesh Police |
Home Affairs |
09-01-2018 |
30-06-2022 |
70 |
Construction of 12 Barracks at Different Units of Police Department |
Home Affairs |
01-01-2016 |
30-06-2019 |
71 |
Construction of 50 Highway Police outpost (2nd RDPP) |
Home Affairs |
01-01-2010 |
30-06-2019 |
72 |
Construction of Barishal Metropolitan and Khulna District Police Line |
Home Affairs |
01-01-2017 |
30-06-2019 |
73 |
Construction of 50 Circle ASP Office cum Residence at Different Places of the Country (25nos. In 1st phase) (Internal Cost Coordination) |
Home Affairs |
01-01-2010 |
30-06-2019 |
74 |
Modernization of existing Police Hospital's |
Home Affairs |
01-07-2019 |
30-06-2019 |
75 |
Establishment of Fire Service & Civil Defence Station in 156 important Upazila/places of the country (1st RDPP) |
Home Affairs |
07-01-2012 |
30-06-2019 |
76 |
Establishment of Fire Service & Civil Defence Stations at 25 (corrected 46) upazilla HQ (2nd RDPP) |
Home Affairs |
01-01-2011 |
01-01-1970 |
77 |
Establishment of 11 Modern Fire service and Civil Defence Stations Project |
Home Affairs |
01-01-2019 |
30-06-2021 |
78 |
Construction of Central jail for under trial prisoner at karanigonj under Dhaka district |
Home Affairs |
01-07-2005 |
30-06-2019 |
79 |
Replacement of Khulna District Jail |
Home Affairs |
01-07-2011 |
30-06-2020 |
80 |
Construction of Jail Training Academy, Rajshahi |
Home Affairs |
01-07-2015 |
30-06-2020 |
81 |
Expansion and Modernization of Mymensingh |
Home Affairs |
01-07-2015 |
30-06-2020 |
82 |
Construction of Residential Quarter for Female Warder in different Jails |
Home Affairs |
01-07-2016 |
30-12-2019 |
83 |
Modernisation of Prisons Security |
Home Affairs |
01-01-2016 |
31-12-2019 |
84 |
Expansion of physical facilities of S. M. Barrack for Ansar and VDP at Districts & Battalion Head Quarters |
Home Affairs |
01-07-2016 |
30-06-2020 |
85 |
Establishment of logistics and fleet maintenance facilities for BCG |
Home Affairs |
01-07-2018 |
30-06-2021 |
86 |
Expansion of Infrastructures of Bangladesh Coast Guard. |
Home Affairs |
01-01-2016 |
30-12-2019 |
87 |
Construction of Administrative Building and Sailors Barrack for three Coast Guard Stations |
Home Affairs |
01-07-2015 |
30-06-2019 |
88 |
Establishment of Testing Laboratory of Narcotics Department in 4 Divisional Cities |
Home Affairs |
01-01-2019 |
30-06-2021 |
89 |
Construction of 17 Regional Passport Offices |
Home Affairs |
01-07-2016 |
30-06-2020 |
90 |
Construction of 16 Regional Passport offices for Immigrations and Passport Department |
Home Affairs |
01-07-2018 |
30-06-2021 |
91 |
Project Request from Kishoreganj PWD Division to Project Division 2 |
Home Affairs |
01-09-2020 |
30-09-2020 |
92 |
Construction of Vocational Training and Rehabilitation Centre for the Disable at CRP, Manikgonj (01/01/2017-31/12/2019) Approved |
Social Welfare |
01-01-2017 |
31-12-2019 |
93 |
Establishment of National Heart Foundation Hospital, Rajshahi (01/07/2018-30/06/2021) |
Social Welfare |
01-07-2018 |
31-12-2020 |
94 |
Establishment of a Hundred Bedded Specialized Hospital in Cumilla (01/01/2017-30/06/2020) |
Social Welfare |
01-07-2017 |
30-06-2020 |
95 |
Establishment/re-establishment of Sarkari Shishu Paribar and Baby Home (01/07/2018-30/06/2021) |
Social Welfare |
01-07-2018 |
30-06-2021 |
96 |
Construction of District Social Services Complex of 64 districts (1st phase in 22 districts (01/07/2018 - 30/06/2020) |
Social Welfare |
01-07-2017 |
30-06-2020 |
97 |
Establishment of Karimpur Noorjahan Shamsunnahar Mother and Child Specialized Hospital (01/07/2018-30/06/2021) |
Social Welfare |
01-07-2018 |
30-06-2021 |
98 |
Establishment sub-specialty unit of Glaucoma, Retina & Cornea at Gausul Azam BNSB Eye Hospital, Dinajpur(01/07/2018-30/06/2020). |
Social Welfare |
01-07-2018 |
30-06-2020 |
99 |
Establishment of 20 Beded Pirgonj Diabetic Hospital, Thakurgaon. (01/07/2017-30/06/2020) |
Social Welfare |
01-07-2017 |
30-06-2020 |
100 |
Amader Bari (Our Home): Integrated Old and Children Home (01/07/2016-30/06/2019) Approved |
Social Welfare |
01-07-2016 |
30-06-2020 |
101 |
Establishment and Extension of Hostel for the Visually Impaired Children (Girls-6, Boys-5 & Extension 20 Units) (01/07/2016-30/06/2019) Approved |
Social Welfare |
01-07-2016 |
31-12-2019 |
102 |
Construction of Madaripur Diabetic hospital |
Social Welfare |
01-12-2018 |
30-11-2023 |
103 |
Construction of " Amader Gram Cancer Care Hospital " project |
Social Welfare |
01-07-2016 |
30-06-2024 |
104 |
Construction of Social Welfare Building |
Social Welfare |
01-07-2019 |
30-06-2025 |
105 |
Construction of Sports complex for people with special needs |
Social Welfare |
01-04-2021 |
31-12-2024 |
106 |
Construction of Transit Shelter Home at Jessore |
Social Welfare |
01-07-2023 |
30-06-2026 |
107 |
Construction of 50 bedded Diabetic Hospital at Gazipur |
Social Welfare |
01-07-2020 |
30-06-2025 |
108 |
Construction of Swadhinata Stambha at Suhrawardy Udyan, Dhaka (3rd Phase) |
Liberation War Affairs |
07-01-2017 |
01-01-1970 |
109 |
Preservation and Development of Buried Places of the Freedom Fighters (1st Phase) Project |
Liberation War Affairs |
07-01-2018 |
30-06-2021 |
110 |
Construction of 560 Model Mosques at each District and Upajillas |
Religious Affairs |
01-06-2017 |
30-06-2024 |
111 |
Construction of Islamic Mission Hospital Complex Building at Sirta, Mymensing and Kalkini, Madaripur |
Religious Affairs |
01-12-2017 |
30-06-2020 |
112 |
Establishment of Gopalgonj Islamic Foundation Complex |
Religious Affairs |
01-07-2017 |
30-06-2020 |
113 |
Remaining work of Vertical extension WAQF Bhaban (5th, 6th,7th) having 20 storied foundation with 2 basement over existing 4th floor |
Religious Affairs |
01-07-2022 |
30-04-2023 |
114 |
* Establishment of Bhola Textile Institute (01/07/14-30/06/17) Approved |
Textiles and Jute |
01-07-2014 |
30-06-2020 |
115 |
Establishment of Sheikh Rasel Textile Institute, Jamalpur (01/01/2015-31/12/2017) |
Textiles and Jute |
01-01-2015 |
31-12-2021 |
116 |
Establishment of Sunamgonj Textiles Institute |
Textiles and Jute |
01-01-2017 |
30-06-2023 |
117 |
Establishment of Sheikh Rehana Textile Engenniring College, Gopalganj (01/07/2013 - 30/06/2018) |
Textiles and Jute |
01-07-2013 |
30-06-2020 |
118 |
Establishment of Gornodi Textile Institute (01/07/2013 - 30/06/2019) |
Textiles and Jute |
01-07-2010 |
30-06-2020 |
119 |
Establishment of Begum Amina Mansooor Textile Engineering Institute Kajipur, Shirajgonj. (01/07/2016 - 30/06/2019) |
Textiles and Jute |
01-07-2016 |
30-06-2020 |
120 |
Development of the existing 07 textile vocational institutes and the establishment of 6 new textile vocational institutes. |
Textiles and Jute |
01-01-2019 |
30-06-2024 |
121 |
Establishment of 5 training centers, 1 fashion design institute, and 2 market promotion centers in 5 basic centers under the Bangladesh Handloom Board (Narayanganj, Tangail, Sirajganj, Bogura, and Kushtia). |
Textiles and Jute |
01-07-2018 |
12-06-2023 |
122 |
Modernization and structural expansion of Bangladesh Handloom Education and Training Institute Narsingdi. |
Textiles and Jute |
01-07-2018 |
30-06-2024 |
123 |
Establishment of Sunamganj Textile Institute. |
Textiles and Jute |
01-07-2018 |
30-06-2024 |
124 |
Setting up Ajijunnecha Textile Vocational Institute Sunamganj. |
Textiles and Jute |
01-07-2020 |
30-06-2025 |
125 |
Establishment of Jagannathpur Textile Vocational Institute, Sunamganj. |
Textiles and Jute |
01-07-2020 |
30-06-2025 |
126 |
Modernization and structural expansion of Bangladesh Handloom Education and Training Institute Narsingdi. |
Textiles and Jute |
01-07-2018 |
30-06-2024 |
127 |
Establishment of Sunamganj Textile Institute. |
Textiles and Jute |
01-07-2018 |
30-06-2024 |
128 |
Establishment of Ajijunnecha Textile Vocational Institute Sunamganj. |
Textiles and Jute |
01-07-2020 |
30-06-2025 |
129 |
Establishment of Jagannathpur Textile Vocational Institute, Sunamganj. |
Textiles and Jute |
01-07-2020 |
30-06-2025 |
130 |
Establishment of Chahiuddin Textile Vocational Institute Meherpur. |
Textiles and Jute |
01-07-2020 |
30-06-2024 |
131 |
Establishment of Vocational Textile Institute, Nazirpur, Pirojpur. |
Textiles and Jute |
01-07-2021 |
30-06-2024 |
132 |
Late Abdur Rab Talukdar Vocational Textile Institute, Madaripur. |
Textiles and Jute |
01-07-2020 |
30-06-2024 |
133 |
Establishment of Akalima Khatun vocational Textile Institute Khulna. |
Textiles and Jute |
01-07-2022 |
30-06-2026 |
134 |
Establishment of Shaheed Sukant Babu Textile Vocational Institute Gournadi, Barisal. |
Textiles and Jute |
01-07-2022 |
31-12-2025 |
135 |
Establishment of Vocational Textile Institute, Bhandaria, Pirojpur. |
Textiles and Jute |
01-07-2021 |
30-06-2026 |
136 |
Establishment of Vocational Textile Institute by Nazrul Islam Vocational Textile Institute, Chandanish, Chittagong. |
Textiles and Jute |
01-07-2023 |
30-06-2026 |
137 |
Establishment of Rupganj, Vocational Textile Institute, Narayanganj. |
Textiles and Jute |
01-07-2023 |
30-06-2026 |
138 |
Construction of 14 Storied Building With Three Basements for Head Office of Bangladesh Investment Development Authority (BIDA) at S.B. Nagar, Dhaka. (01/07/2011-31/12/2019) Appproved |
Finance |
01-07-2011 |
31-12-2019 |
139 |
Construction of 12 storied Bangladesh NGO-Foundation Office Building with 2 Basement (12+2) including Civil, Sanitary and Internal Electrification works at Sher-E-Bangla Nagar, Dhaka. |
Finance |
01-04-2018 |
31-12-2020 |
140 |
Khulna Tax Building Construction Project. |
Finance |
01-07-2019 |
30-06-2024 |
141 |
Hili, Burimari and Banglabandha LC Station Construction Project. |
Finance |
01-07-2018 |
30-06-2023 |
142 |
Microcredit Regularity Authority Building |
Finance |
01-07-2021 |
31-12-2023 |
143 |
NGO Foundation Office Building |
Finance |
01-03-2021 |
31-12-2023 |
144 |
Central Depository Bangladesh Limited (CDBL) Building |
Finance |
01-07-2023 |
30-06-2026 |
145 |
Investment Corporation of Bangladesh (ICB) Building. |
Finance |
01-11-2016 |
30-06-2027 |
146 |
Construction of 12-storied Building with Ancillary Facilities for Expansion of Bangladesh Supreme Court |
Law, Justice and Parliamentary Affairs |
01-12-2017 |
30-06-2020 |
147 |
Construction of District Registrar's Office and Sub Registrar's Office in Different Districts of Bangladesh (2nd Phase) |
Law, Justice and Parliamentary Affairs |
01-01-2017 |
31-12-2019 |
148 |
Construction of Chief Judicial Magistrate Court Building in 64 Districts of Bangladesh (1st Phase) (2nd Revised) |
Law, Justice and Parliamentary Affairs |
01-02-2009 |
30-06-2020 |
149 |
Construction 15 Storied Building on Existing Place of Bangladesh Bar Council Building |
Law, Justice and Parliamentary Affairs |
01-07-2018 |
30-06-2021 |
150 |
Farmers Training at the upozila level for transfer at Technology (3rd Phase) Project |
Agriculture |
01-01-2018 |
01-01-1970 |
151 |
Modernization of Agriculture Information Service and Digital Agriculture Information and Communication Strengthening Project |
Agriculture |
01-01-2018 |
01-01-1970 |
152 |
Expansion of cotton Cultivation Project (Phase-1) |
Agriculture |
07-01-2014 |
01-01-1970 |
153 |
Name of Project For Checking |
Agriculture |
01-08-2020 |
31-08-2020 |
154 |
This is a test Project |
Food |
01-09-2020 |
30-09-2020 |
155 |
Construction of Bangladesh Telecommunication Regulatory Commission Building at Sher-e-Bangla Nagar, Dhaka. |
Posts, Telecommunications & Information Technology |
01-04-2018 |
31-12-2020 |
156 |
Construction of Information Commission Bhaban |
Information and Broadcasting |
01-07-2018 |
30-06-2021 |
157 |
Installation of Modern and Digital Broadcast Equipment in National Broadcasting House |
Information and Broadcasting |
01-01-2016 |
30-06-2020 |
158 |
Modernization and Installation of Digital Broadcasting Equipment at Bangladesh Betar, Sylhet. |
Information and Broadcasting |
01-07-2018 |
30-06-2024 |
159 |
Establishment of 1000 Kilowatt Medium Web Transmitter at Super Power Transmitting Station of Bangladesh Betar |
Information and Broadcasting |
01-01-2016 |
30-06-2020 |
160 |
Establishment of Nationwide Digital Terrestrial Television Broadcasting of Bangladesh Television (1st Phase) |
Information and Broadcasting |
01-07-2018 |
31-12-2020 |
161 |
Construction of Transmitting Tower, Building and Installation of Transmitting Equipment for Bangladesh Television Chattogram Center, Pahartoli |
Information and Broadcasting |
01-01-2016 |
31-12-2019 |
162 |
Installation of Modern and Digital Broadcast Equipment in National Broadcasting House (01/01/2016-30/06/2020) |
Information and Broadcasting |
01-01-2016 |
31-12-2019 |
163 |
Construction of Modern District Information Complex |
Information and Broadcasting |
01-10-2020 |
31-12-2024 |
164 |
Modernization of Cottogram Betar |
Information and Broadcasting |
01-07-2021 |
30-06-2024 |
165 |
Transformation of Cottogram TV Center into independent Tv Center |
Information and Broadcasting |
01-11-2021 |
31-10-2024 |
166 |
Sustainable Forests and Livelihoods Project- |
Environment, Forest and Climate Change |
01-07-2018 |
31-12-2024 |
167 |
Detective and Modernization Project 06 office in the Ministry of Labor |
Labour and Employment |
04-01-2017 |
01-01-1970 |
168 |
Construction of Hill Tracks Complex at Baily Road, Dhaka |
Chattogram Hill Tracts Affairs |
01-01-2016 |
30-06-2019 |
169 |
Construction of Chittagong Hill Tracks Regional Council Complex |
Chattogram Hill Tracts Affairs |
02-03-2019 |
30-06-2024 |
170 |
Construction of Parjatan Bhaban at Shere-e-Bangla Nagar, Agargaon |
Civil Aviation and Tourism |
07-01-2017 |
01-01-1970 |
171 |
Construction of Bhumi Bhaban Complex (1st RDPP) |
Land |
07-07-2015 |
31-12-2020 |
172 |
Vertical Extension of Administration Center (LATC) from 5th to 11th Floor |
Land |
07-01-2016 |
31-12-2019 |
173 |
Construction of Upazilla and Union Land office (6th stage) (1st RDPP) |
Land |
07-01-2014 |
01-01-1970 |
174 |
Project Req from kishorganj to pd3 |
Land |
01-09-2020 |
30-09-2020 |
175 |
Construction of new female hostels in Nilkhet, and development of working women hostels in different districts of the country |
Women and Children Affairs |
01-07-2017 |
30-06-2020 |
176 |
Vertical Extension of Working Women Hostels Located at Mirpur & Khilgaon in Dhaka (01/07/2016 - 30/06/2019) |
Women and Children Affairs |
01-07-2016 |
30-06-2019 |
177 |
Establishment of Vocational Training Centre and Hostel at Sonaimuri, Kaligong, Araihazar & Modhbaria Upazilla. |
Women and Children Affairs |
01-07-2014 |
30-06-2019 |
178 |
Construction of Joyeeta Tower ( 1st Revision ) |
Women and Children Affairs |
22-07-2018 |
31-12-2023 |
179 |
Construction of " Women training center cum Hostel " at Shivchar in Madaripur . |
Women and Children Affairs |
01-07-2020 |
30-06-2024 |
180 |
Marine Fisheries Research Strengthening and Infrastructure Development Projcet |
Fisheries and Livestock |
01-07-2017 |
30-06-2021 |
181 |
Strengthening of Department of Livestock
|
Fisheries and Livestock |
01-01-2020 |
30-06-2024 |
182 |
Strengthening of Bangladesh Institute of Management Dhaka |
Industries |
04-01-2018 |
30-06-2021 |
183 |
Construction of Woman Hostal of BITAC Chittagnog Khulna and Bagura |
Industries |
07-01-2018 |
01-01-1970 |
184 |
Modernization of BSTI Regional Offices at Chattogram and Khulna |
Industries |
07-01-2015 |
01-01-1970 |
185 |
Establishment of Tool Institute with testing Facilities to Strengthen BITAC |
Industries |
01-01-2016 |
01-01-1970 |
186 |
Establishment of National Gene Bank |
Science and Technology |
01-03-2018 |
30-06-2021 |
187 |
Establishment of Bangabandhu Sheikh Mujibur Rahman Novo Theatre at Rajshahi (01/07/2017 - 30/06/2020) |
Science and Technology |
01-07-2017 |
30-06-2024 |
188 |
Construction of Rooppur Nuclear Power Plant (Main Phase) (01/07/2016- 30/12/2025) |
Science and Technology |
01-07-2016 |
31-12-2025 |
189 |
Establishment of Bangabandhu Sheikh Mujibur Rahman Novo Theatre at Barisal |
Science and Technology |
01-01-2020 |
31-12-2025 |
190 |
Establishment of Bangabandhu Sheikh Mujibur Rahman Novo Theatre at Rangpur |
Science and Technology |
01-07-2021 |
30-06-2024 |
191 |
Establishment of Bangabandhu Sheikh Mujibur Rahman Novo Theatre at Khulna |
Science and Technology |
01-01-2022 |
31-12-2024 |
192 |
Establishment of Bangabandhu Sheikh Mujibur Rahman Observatory at Bhanga, Faridpur. |
Science and Technology |
01-07-2021 |
31-12-2024 |
193 |
Bangladesh Oceanographic Research Institute |
Science and Technology |
01-04-2022 |
31-03-2025 |
194 |
Construction of Bangladesh Copyright Bhaban |
Cultural Affairs |
07-01-2016 |
01-01-1970 |
195 |
Construction of Building for 1971: Genocide-Torture Archive & Museum |
Cultural Affairs |
01-01-2019 |
01-01-1970 |
196 |
Extension of Museum Building and construction of other Physical Infrastructure of the Bangladesh Folk Art & Crafts Foundation |
Cultural Affairs |
01-01-2019 |
01-01-1970 |
197 |
Construction of Shailajaranjan Cultural Center at Mohanganj Upazila |
Cultural Affairs |
01-09-2018 |
30-06-2020 |
198 |
Construction of Administration Training Center , Guest House and Dormitory Building at Manipuri Lalitakala Academy |
Cultural Affairs |
01-07-2017 |
30-06-2020 |
199 |
Construction of Divisional and Zila Shipakala Academies |
Cultural Affairs |
01-05-2014 |
30-06-2020 |
200 |
Structural Development of Khagrachari Khudra Nreegoshtir Sangskritute |
Cultural Affairs |
07-01-2016 |
01-01-1970 |
201 |
Establishment of 40 (forty) Technical Training Centre (TTC) at Upazila level and 1 (One) Institute of Marine Technology (IMT) at Chattogram |
Expatriates' Welfare & Overseas Employment |
01-01-2016 |
30-06-2022 |
202 |
Establishment of Dhaka Technical Teachers Training Institute (DTTTI) |
Expatriates' Welfare & Overseas Employment |
07-01-2016 |
01-01-1970 |
203 |
Capacity Development Program of TTC, Rajshahi |
Expatriates' Welfare & Overseas Employment |
01-01-2016 |
01-01-1970 |
204 |
Strengthening and Modernization of Apprenticeship Training Offices at Dhaka, Chittagong and Khulna |
Expatriates' Welfare & Overseas Employment |
07-01-2018 |
30-06-2021 |
205 |
Establishment of Four Marine Academy in Bangladesh (Pabna, Barishal, Sylhet & Rangpur |
Shipping |
07-01-2012 |
01-01-1970 |
206 |
Construction of Head office Building of Bangladesh Land Port Authority at Sher-e-Banglanagar |
Shipping |
07-01-2016 |
01-01-1970 |
207 |
Construction of Revenue Building (01/07/2009 - 30/06/2019)-approved |
Internal Resources Division |
01-07-2009 |
31-12-2019 |