Sl. |
Project title |
Ministry Name |
Start Date |
End Date |
1 |
ESTABLISHMENT OF 500-BEDED HOSPITAL & ANCILLARY BUILDINGS IN JESSORE, COX’S BAZAR, PABNA AND ABDUL MALEK UKIL MEDICAL COLLEGE (AMUMC) AND JONONETA NURUL HOQUE ADHUNIK HOSPITAL, NOAKHALI |
Health and Family Welfare |
01-07-2018 |
30-06-2021 |
2 |
Expansion of National Institute of Neuro-Sciences & Hospital (01 January 2018 - 31 December 2020) |
Health and Family Welfare |
01-01-2018 |
31-12-2020 |
3 |
Establishment of Patuakhali Medical College and Hospital, Patuakhali (01/07/2016 - 30/06/2020) |
Health and Family Welfare |
01-07-2016 |
30-06-2020 |
4 |
Establishment of Jamalpur Medical College and Hospital & Jamalpur Nursing College, Jamalpur (01/07/2016 - 30/06/2019) |
Health and Family Welfare |
01-07-2016 |
30-06-2019 |
5 |
Establishment of Kustia Medical College (01/01/2012-31/12/2019) approved |
Health and Family Welfare |
01-12-2012 |
19-12-2019 |
6 |
Shaheed M Monsur Ali Medical College and 500 Bedded Medical College Hospital, at Sirajganj. (01/07/16 - 30/06/19) |
Health and Family Welfare |
01-07-2016 |
30-07-2020 |
7 |
Establishment of Colonel Maleque Medical College & 500 bedded Hospital, Manikgonj (01/07/15 - 30/06/21) |
Health and Family Welfare |
01-07-2015 |
30-06-2021 |
8 |
Establishment of Tangail Medical College & Extension of 250 Bedded General Hospital in 500 Bedded Medical College Hospital, Tangail. (01/07/16 - 30/06/19) |
Health and Family Welfare |
01-07-2016 |
30-06-2019 |
9 |
Extansion Project of Seikh Abu Naser Hospital at Khulna (01/07/2012-31/12/2019) approved |
Health and Family Welfare |
01-07-2012 |
31-12-2019 |
10 |
Establishment of Shaheed Sayed Nazrul Islam Medical College and Hospital, Kishoreganj (01/07/2012 - 30/06/2018) |
Health and Family Welfare |
01-07-2012 |
31-12-2018 |
11 |
Establishment of National Institute Of Digestive Disease Research and Hospital (01/09/11-30/06/2018) approved |
Health and Family Welfare |
01-09-2011 |
31-12-2019 |
12 |
Extension of National Institute of Traumatology and Orthopedic Rehabilitation (1st Revised) (01/07/2013-30/06/2018 |
Health and Family Welfare |
01-07-2013 |
30-06-2019 |
13 |
Establishment of Universal Nursing Institute (01/07/2017-31/12/2019) |
Health and Family Welfare |
01-07-2017 |
31-12-2019 |
14 |
Establish 150-bed cardiovascular unit at the National Heart Foundation |
Health and Family Welfare |
01-01-2019 |
31-12-2021 |
15 |
Construction of Multipurpose Residential Flat at Hospital Zone Motijheel Colony (01/09/2017-30/06/2020) Approved |
Housing and Public Works |
01-09-2017 |
30-06-2020 |
16 |
Construction of 456 nos Govt. Residential Flats at Malibag, Dhaka (01/01/16 - 30/06/2020) |
Housing and Public Works |
01-01-2016 |
30-06-2020 |
17 |
Construction of Multistoried Building for Government Offices in Madaripur (01/01/2016 - 30/06/2020) |
Housing and Public Works |
01-01-2016 |
30-06-2020 |
18 |
Construction of 288 nos Govt. Residential Flats for PWD Officers at Section-6, Mirpur, Dhaka (01/01/2016 -30/12/2019) |
Housing and Public Works |
01-01-2016 |
31-12-2019 |
19 |
Construction of 672 residential flats in 8 15-storey buildings for government officials in Narayanganj Aliganj. |
Housing and Public Works |
01-01-2016 |
30-06-2025 |
20 |
Construction of 288 nos. Govt. Residential Flat (PWD & Dept. of Architect) at Zigatola Colony) (01/09/2017-30/06/2020) Approved |
Housing and Public Works |
01-09-2017 |
30-06-2020 |
21 |
Construction of Multi storied Govt. Officer Building in Gopalgonj |
Housing and Public Works |
01-09-2017 |
30-06-2024 |
22 |
Construction of Residential building for Government officer/staffs at Noakhli Sadar. |
Housing and Public Works |
01-01-2018 |
30-06-2020 |
23 |
Internal repair and renovation of cafeteria and various halls at Prime Minister's office. |
Housing and Public Works |
01-02-2018 |
30-06-2019 |
24 |
Construction of Govt. Officer’s Quarter at Azimpur Colony, Dhaka (Phase-2) (01/07/2017-30/06/2020) Approved |
Housing and Public Works |
01-07-2017 |
30-06-2020 |
25 |
Infrastructural development of Ramna Park at Dhaka and overall beautification including Ramna Lake (01/10/2018 - 31/12/2020) Approved |
Housing and Public Works |
01-10-2018 |
31-12-2020 |
26 |
Modernization of Osmani Memorial Auditorium (01/09/2018-30/06/2020) Approved |
Housing and Public Works |
01-09-2018 |
30-06-2020 |
27 |
Development of two mos. Of Park with Modern Facilites & one Play Ground of PWD’s land at Cox’s Bazar |
Housing and Public Works |
01-10-2017 |
31-12-2023 |
28 |
Construction of 2 nos. Residential Bhaban in premises of Prime Minister’s Office at Tejgaon. |
Housing and Public Works |
01-09-2017 |
30-06-2020 |
29 |
Construction of Govt. Residential flat and Dormitory at Abandon House in Chattogram. |
Housing and Public Works |
01-02-2017 |
30-06-2025 |
30 |
Construction of 288 nos. Govt. Residential Flat (PWD & Dept. of Architect) at Zigatola Colony) (01/09/2017-30/06/2020) Approved |
Housing and Public Works |
01-01-2018 |
31-12-2020 |
31 |
Construction of multi storied residential flat for government officer/staff at Tejgaon, Dhaka (13 storied). |
Housing and Public Works |
01-07-2018 |
30-06-2020 |
32 |
Accommodation for Judicial Officers at Azimpur, Dhaka, (01/07/2016-30/06/2020) Approved |
Housing and Public Works |
01-08-2016 |
30-06-2021 |
33 |
Construction of 684 flat at 9 multi storied building replacing 11 abandoned buildings at CGS colony in Agrabad, Chattogram (01/07/2018-30/06/2020) Approved |
Housing and Public Works |
01-07-2018 |
30-06-2020 |
34 |
Construction of 398 nos Govt. Residential Flats (20 nos. Building) at 20 nos . Abandoned House in Gulsan, Dhanmondi & Mohammadpur, Dhaka; |
Housing and Public Works |
01-07-2016 |
30-06-2025 |
35 |
Modernization of important electrical/ mechanical systems of Prime minister’s office and Gonobhaban (01/07/2018-30/09/2019) Approved |
Housing and Public Works |
01-07-2018 |
30-09-2019 |
36 |
Construction of multi-storied residential building for government officials at Azimpur Government Colony in Dhaka (Zone-A) |
Housing and Public Works |
01-01-2019 |
31-12-2024 |
37 |
Construction of residential flats for government officials/employees in 36 abandoned houses of Chittagong. |
Housing and Public Works |
01-09-2018 |
30-06-2025 |
38 |
Construction of 20 storied new office building at Bangladesh Secretariat |
Housing and Public Works |
01-01-2019 |
30-06-2024 |
39 |
Construction of Residential flats for Government officers at Mirpur-6, Dhaka. |
Housing and Public Works |
01-01-2018 |
31-12-2020 |
40 |
Construction of multi-storied government office building in Sher-E-Bangla Nagar administrative area of Dhaka. |
Housing and Public Works |
01-01-2024 |
31-12-2026 |
41 |
Construction of 123 flats for government officials and employees in Tejgaon industrial area of Dhaka. |
Housing and Public Works |
01-01-2024 |
31-12-2026 |
42 |
Construction of Rashtriya Guest House at Plot No. 1, Road No. 84, N-E(M) Block, Gulshan. |
Housing and Public Works |
01-01-2024 |
31-12-2025 |
43 |
Modernization of Mirpur Shahid Intellectual Memorial in Dhaka. |
Housing and Public Works |
01-11-2023 |
31-10-2024 |
44 |
Construction and electrical modernization of Toshakhana, Durbar Hall, Cabinet Hall, Kitchen and Shelter House among other places inside Banga Bhavan. |
Housing and Public Works |
01-04-2023 |
31-12-2024 |
45 |
Construction of 112 residential flats for government officials of Bangladesh Parliament Secretariat at Agargaon, Dhaka. |
Housing and Public Works |
01-01-2023 |
31-12-2025 |
46 |
Bangladesh Jatiya Sangsad Bhavan area including electrical-mechanical and security system and other development works. |
Housing and Public Works |
01-10-2022 |
30-09-2024 |
47 |
Development of UN green garden with modern facilities in Panchlaish residential area of Chittagong district. |
Housing and Public Works |
01-07-2022 |
30-06-2024 |
48 |
Modernization of Special Security Force (SSF) firing ranges. |
Housing and Public Works |
01-01-2020 |
30-06-2024 |
49 |
Construction of multi-storied residential flats for government officials and employees at Mirpur Paikpara in Dhaka. |
Housing and Public Works |
01-10-2019 |
31-12-2024 |
50 |
Construction of multi-storied building in campus of Officers Club, Dhaka. |
Housing and Public Works |
01-07-2019 |
30-06-2025 |
51 |
Modernization and upward expansion of Sobhan Bagh Mosque in Dhaka. |
Housing and Public Works |
01-03-2019 |
31-12-2023 |
52 |
Building protection projects in urban areas. |
Housing and Public Works |
01-01-2016 |
31-12-2025 |
53 |
Development and Revenue |
Housing and Public Works |
|
|
54 |
Reconstruction of Cumilla Central Jail. |
Home Affairs |
01-01-2019 |
31-12-2021 |
55 |
Construction of 09 residential Tower Building in Dhaka Metropolitan Area |
Home Affairs |
01-11-2018 |
30-06-2021 |
56 |
Construction of 9 residential tower buildings for Bangladesh Police at different Places of the Country. |
Home Affairs |
01-11-2018 |
30-06-2021 |
57 |
Construction of Armory for 19 Districts (1st RDPP) |
Home Affairs |
07-01-2015 |
30-06-2018 |
58 |
Construction of RAB Head Quarter Building |
Home Affairs |
01-01-2018 |
30-06-2021 |
59 |
Establishment of Five RAB complex and a RAB Training School (1st RDPP) |
Home Affairs |
01-01-2013 |
30-06-2020 |
60 |
Vertical Extension of NCCOM Builidng for Modernization and Strengthening of Bangladesh Police. |
Home Affairs |
01-01-2018 |
30-06-2020 |
61 |
Construction of Residential Quarter for Senior Officers of Bangladesh Police. |
Home Affairs |
01-11-2018 |
30-06-2020 |
62 |
Construction of 101 Dilapidated Thana Building in Type Plan for Police Department (1st RDPP) |
Home Affairs |
07-01-2012 |
30-06-2019 |
63 |
Construction of Counter-terrorism and Transnational Crime Prevention Center for Bangladesh Police |
Home Affairs |
09-01-2018 |
30-06-2022 |
64 |
Construction of 12 Barracks at Different Units of Police Department |
Home Affairs |
01-01-2016 |
30-06-2019 |
65 |
Construction of 50 Highway Police outpost (2nd RDPP) |
Home Affairs |
01-01-2010 |
30-06-2019 |
66 |
Construction of Barishal Metropolitan and Khulna District Police Line |
Home Affairs |
01-01-2017 |
30-06-2019 |
67 |
Construction of 50 Circle ASP Office cum Residence at Different Places of the Country (25nos. In 1st phase) (Internal Cost Coordination) |
Home Affairs |
01-01-2010 |
30-06-2019 |
68 |
Modernization of existing Police Hospital's |
Home Affairs |
01-07-2019 |
30-06-2019 |
69 |
Establishment of Fire Service & Civil Defence Station in 156 important Upazila/places of the country (1st RDPP) |
Home Affairs |
07-01-2012 |
30-06-2019 |
70 |
Establishment of Fire Service & Civil Defence Stations at 25 (corrected 46) upazilla HQ (2nd RDPP) |
Home Affairs |
01-01-2011 |
01-01-1970 |
71 |
Establishment of 11 Modern Fire service and Civil Defence Stations Project |
Home Affairs |
01-01-2019 |
30-06-2021 |
72 |
Construction of Central jail for under trial prisoner at karanigonj under Dhaka district |
Home Affairs |
01-07-2005 |
30-06-2019 |
73 |
Replacement of Khulna District Jail |
Home Affairs |
01-07-2011 |
30-06-2020 |
74 |
Construction of Jail Training Academy, Rajshahi |
Home Affairs |
01-07-2015 |
30-06-2020 |
75 |
Expansion and Modernization of Mymensingh |
Home Affairs |
01-07-2015 |
30-06-2020 |
76 |
Construction of Residential Quarter for Female Warder in different Jails |
Home Affairs |
01-07-2016 |
30-12-2019 |
77 |
Modernisation of Prisons Security |
Home Affairs |
01-01-2016 |
31-12-2019 |
78 |
Expansion of physical facilities of S. M. Barrack for Ansar and VDP at Districts & Battalion Head Quarters |
Home Affairs |
01-07-2016 |
30-06-2020 |
79 |
Establishment of logistics and fleet maintenance facilities for BCG |
Home Affairs |
01-07-2018 |
30-06-2021 |
80 |
Expansion of Infrastructures of Bangladesh Coast Guard. |
Home Affairs |
01-01-2016 |
30-12-2019 |
81 |
Construction of Administrative Building and Sailors Barrack for three Coast Guard Stations |
Home Affairs |
01-07-2015 |
30-06-2019 |
82 |
Establishment of Testing Laboratory of Narcotics Department in 4 Divisional Cities |
Home Affairs |
01-01-2019 |
30-06-2021 |
83 |
Construction of 17 Regional Passport Offices |
Home Affairs |
01-07-2016 |
30-06-2020 |
84 |
Construction of 16 Regional Passport offices for Immigrations and Passport Department |
Home Affairs |
01-07-2018 |
30-06-2021 |
85 |
Project Request from Kishoreganj PWD Division to Project Division 2 |
Home Affairs |
01-09-2020 |
30-09-2020 |
86 |
Construction of Vocational Training and Rehabilitation Centre for the Disable at CRP, Manikgonj (01/01/2017-31/12/2019) Approved |
Social Welfare |
01-01-2017 |
31-12-2019 |
87 |
Establishment of National Heart Foundation Hospital, Rajshahi (01/07/2018-30/06/2021) |
Social Welfare |
01-07-2018 |
31-12-2020 |
88 |
Establishment of a Hundred Bedded Specialized Hospital in Cumilla (01/01/2017-30/06/2020) |
Social Welfare |
01-07-2017 |
30-06-2020 |
89 |
Establishment/re-establishment of Sarkari Shishu Paribar and Baby Home (01/07/2018-30/06/2021) |
Social Welfare |
01-07-2018 |
30-06-2021 |
90 |
Construction of District Social Services Complex of 64 districts (1st phase in 22 districts (01/07/2018 - 30/06/2020) |
Social Welfare |
01-07-2017 |
30-06-2020 |
91 |
Establishment of Karimpur Noorjahan Shamsunnahar Mother and Child Specialized Hospital (01/07/2018-30/06/2021) |
Social Welfare |
01-07-2018 |
30-06-2021 |
92 |
Establishment sub-specialty unit of Glaucoma, Retina & Cornea at Gausul Azam BNSB Eye Hospital, Dinajpur(01/07/2018-30/06/2020). |
Social Welfare |
01-07-2018 |
30-06-2020 |
93 |
Establishment of 20 Beded Pirgonj Diabetic Hospital, Thakurgaon. (01/07/2017-30/06/2020) |
Social Welfare |
01-07-2017 |
30-06-2020 |
94 |
Amader Bari (Our Home): Integrated Old and Children Home (01/07/2016-30/06/2019) Approved |
Social Welfare |
01-07-2016 |
30-06-2020 |
95 |
Establishment and Extension of Hostel for the Visually Impaired Children (Girls-6, Boys-5 & Extension 20 Units) (01/07/2016-30/06/2019) Approved |
Social Welfare |
01-07-2016 |
31-12-2019 |
96 |
Construction of Madaripur Diabetic hospital |
Social Welfare |
01-12-2018 |
30-11-2023 |
97 |
Construction of " Amader Gram Cancer Care Hospital " project |
Social Welfare |
01-07-2016 |
30-06-2024 |
98 |
Construction of Social Welfare Building |
Social Welfare |
01-07-2019 |
30-06-2025 |
99 |
Construction of Sports complex for people with special needs |
Social Welfare |
01-04-2021 |
31-12-2024 |
100 |
Construction of Transit Shelter Home at Jessore |
Social Welfare |
01-07-2023 |
30-06-2026 |
101 |
Construction of 50 bedded Diabetic Hospital at Gazipur |
Social Welfare |
01-07-2020 |
30-06-2025 |
102 |
Construction of Swadhinata Stambha at Suhrawardy Udyan, Dhaka (3rd Phase) |
Liberation War Affairs |
07-01-2017 |
01-01-1970 |
103 |
Preservation and Development of Buried Places of the Freedom Fighters (1st Phase) Project |
Liberation War Affairs |
07-01-2018 |
30-06-2021 |
104 |
Construction of 560 Model Mosques at each District and Upajillas |
Religious Affairs |
01-06-2017 |
30-06-2024 |
105 |
Construction of Islamic Mission Hospital Complex Building at Sirta, Mymensing and Kalkini, Madaripur |
Religious Affairs |
01-12-2017 |
30-06-2020 |
106 |
Establishment of Gopalgonj Islamic Foundation Complex |
Religious Affairs |
01-07-2017 |
30-06-2020 |
107 |
Remaining work of Vertical extension WAQF Bhaban (5th, 6th,7th) having 20 storied foundation with 2 basement over existing 4th floor |
Religious Affairs |
01-07-2022 |
30-04-2023 |
108 |
* Establishment of Bhola Textile Institute (01/07/14-30/06/17) Approved |
Textiles and Jute |
01-07-2014 |
30-06-2020 |
109 |
Establishment of Sunamgonj Textiles Institute |
Textiles and Jute |
01-01-2017 |
30-06-2023 |
110 |
Establishment of Gornodi Textile Institute (01/07/2013 - 30/06/2019) |
Textiles and Jute |
01-07-2010 |
30-06-2020 |
111 |
Establishment of Begum Amina Mansooor Textile Engineering Institute Kajipur, Shirajgonj. (01/07/2016 - 30/06/2019) |
Textiles and Jute |
01-07-2016 |
30-06-2020 |
112 |
Development of the existing 07 textile vocational institutes and the establishment of 6 new textile vocational institutes. |
Textiles and Jute |
01-01-2019 |
30-06-2024 |
113 |
Establishment of 5 training centers, 1 fashion design institute, and 2 market promotion centers in 5 basic centers under the Bangladesh Handloom Board (Narayanganj, Tangail, Sirajganj, Bogura, and Kushtia). |
Textiles and Jute |
01-07-2018 |
12-06-2023 |
114 |
Modernization and structural expansion of Bangladesh Handloom Education and Training Institute Narsingdi. |
Textiles and Jute |
01-07-2018 |
30-06-2024 |
115 |
Establishment of Sunamganj Textile Institute. |
Textiles and Jute |
01-07-2018 |
30-06-2024 |
116 |
Setting up Ajijunnecha Textile Vocational Institute Sunamganj. |
Textiles and Jute |
01-07-2020 |
30-06-2025 |
117 |
Establishment of Jagannathpur Textile Vocational Institute, Sunamganj. |
Textiles and Jute |
01-07-2020 |
30-06-2025 |
118 |
Modernization and structural expansion of Bangladesh Handloom Education and Training Institute Narsingdi. |
Textiles and Jute |
01-07-2018 |
30-06-2024 |
119 |
Establishment of Sunamganj Textile Institute. |
Textiles and Jute |
01-07-2018 |
30-06-2024 |
120 |
Establishment of Ajijunnecha Textile Vocational Institute Sunamganj. |
Textiles and Jute |
01-07-2020 |
30-06-2025 |
121 |
Establishment of Jagannathpur Textile Vocational Institute, Sunamganj. |
Textiles and Jute |
01-07-2020 |
30-06-2025 |
122 |
Establishment of Chahiuddin Textile Vocational Institute Meherpur. |
Textiles and Jute |
01-07-2020 |
30-06-2024 |
123 |
Establishment of Vocational Textile Institute, Nazirpur, Pirojpur. |
Textiles and Jute |
01-07-2021 |
30-06-2024 |
124 |
Late Abdur Rab Talukdar Vocational Textile Institute, Madaripur. |
Textiles and Jute |
01-07-2020 |
30-06-2024 |
125 |
Establishment of Akalima Khatun vocational Textile Institute Khulna. |
Textiles and Jute |
01-07-2022 |
30-06-2026 |
126 |
Establishment of Shaheed Sukant Babu Textile Vocational Institute Gournadi, Barisal. |
Textiles and Jute |
01-07-2022 |
31-12-2025 |
127 |
Establishment of Vocational Textile Institute, Bhandaria, Pirojpur. |
Textiles and Jute |
01-07-2021 |
30-06-2026 |
128 |
Establishment of Vocational Textile Institute by Nazrul Islam Vocational Textile Institute, Chandanish, Chittagong. |
Textiles and Jute |
01-07-2023 |
30-06-2026 |
129 |
Establishment of Rupganj, Vocational Textile Institute, Narayanganj. |
Textiles and Jute |
01-07-2023 |
30-06-2026 |
130 |
Construction of 14 Storied Building With Three Basements for Head Office of Bangladesh Investment Development Authority (BIDA) at S.B. Nagar, Dhaka. (01/07/2011-31/12/2019) Appproved |
Finance |
01-07-2011 |
31-12-2019 |
131 |
Construction of 12 storied Bangladesh NGO-Foundation Office Building with 2 Basement (12+2) including Civil, Sanitary and Internal Electrification works at Sher-E-Bangla Nagar, Dhaka. |
Finance |
01-04-2018 |
31-12-2020 |
132 |
Khulna Tax Building Construction Project. |
Finance |
01-07-2019 |
30-06-2024 |
133 |
Hili, Burimari and Banglabandha LC Station Construction Project. |
Finance |
01-07-2018 |
30-06-2023 |
134 |
Microcredit Regularity Authority Building |
Finance |
01-07-2021 |
31-12-2023 |
135 |
NGO Foundation Office Building |
Finance |
01-03-2021 |
31-12-2023 |
136 |
Central Depository Bangladesh Limited (CDBL) Building |
Finance |
01-07-2023 |
30-06-2026 |
137 |
Investment Corporation of Bangladesh (ICB) Building. |
Finance |
01-11-2016 |
30-06-2027 |
138 |
Construction of 12-storied Building with Ancillary Facilities for Expansion of Bangladesh Supreme Court |
Law, Justice and Parliamentary Affairs |
01-12-2017 |
30-06-2020 |
139 |
Construction of District Registrar's Office and Sub Registrar's Office in Different Districts of Bangladesh (2nd Phase) |
Law, Justice and Parliamentary Affairs |
01-01-2017 |
31-12-2019 |
140 |
Construction of Chief Judicial Magistrate Court Building in 64 Districts of Bangladesh (1st Phase) (2nd Revised) |
Law, Justice and Parliamentary Affairs |
01-02-2009 |
30-06-2020 |
141 |
Construction 15 Storied Building on Existing Place of Bangladesh Bar Council Building |
Law, Justice and Parliamentary Affairs |
01-07-2018 |
30-06-2021 |
142 |
Farmers Training at the upozila level for transfer at Technology (3rd Phase) Project |
Agriculture |
01-01-2018 |
01-01-1970 |
143 |
Modernization of Agriculture Information Service and Digital Agriculture Information and Communication Strengthening Project |
Agriculture |
01-01-2018 |
01-01-1970 |
144 |
Expansion of cotton Cultivation Project (Phase-1) |
Agriculture |
07-01-2014 |
01-01-1970 |
145 |
Name of Project For Checking |
Agriculture |
01-08-2020 |
31-08-2020 |
146 |
This is a test Project |
Food |
01-09-2020 |
30-09-2020 |
147 |
Construction of Bangladesh Telecommunication Regulatory Commission Building at Sher-e-Bangla Nagar, Dhaka. |
Posts, Telecommunications & Information Technology |
01-04-2018 |
31-12-2020 |
148 |
Construction of Information Commission Bhaban |
Information and Broadcasting |
01-07-2018 |
30-06-2021 |
149 |
Installation of Modern and Digital Broadcast Equipment in National Broadcasting House |
Information and Broadcasting |
01-01-2016 |
30-06-2020 |
150 |
Modernization and Installation of Digital Broadcasting Equipment at Bangladesh Betar, Sylhet. |
Information and Broadcasting |
01-07-2018 |
30-06-2024 |
151 |
Establishment of 1000 Kilowatt Medium Web Transmitter at Super Power Transmitting Station of Bangladesh Betar |
Information and Broadcasting |
01-01-2016 |
30-06-2020 |
152 |
Establishment of Nationwide Digital Terrestrial Television Broadcasting of Bangladesh Television (1st Phase) |
Information and Broadcasting |
01-07-2018 |
31-12-2020 |
153 |
Construction of Transmitting Tower, Building and Installation of Transmitting Equipment for Bangladesh Television Chattogram Center, Pahartoli |
Information and Broadcasting |
01-01-2016 |
31-12-2019 |
154 |
Installation of Modern and Digital Broadcast Equipment in National Broadcasting House (01/01/2016-30/06/2020) |
Information and Broadcasting |
01-01-2016 |
31-12-2019 |
155 |
Construction of Modern District Information Complex |
Information and Broadcasting |
01-10-2020 |
31-12-2024 |
156 |
Modernization of Cottogram Betar |
Information and Broadcasting |
01-07-2021 |
30-06-2024 |
157 |
Transformation of Cottogram TV Center into independent Tv Center |
Information and Broadcasting |
01-11-2021 |
31-10-2024 |
158 |
Sustainable Forests and Livelihoods Project- |
Environment, Forest and Climate Change |
01-07-2018 |
31-12-2024 |
159 |
Detective and Modernization Project 06 office in the Ministry of Labor |
Labour and Employment |
04-01-2017 |
01-01-1970 |
160 |
Construction of Hill Tracks Complex at Baily Road, Dhaka |
Chattogram Hill Tracts Affairs |
01-01-2016 |
30-06-2019 |
161 |
Construction of Chittagong Hill Tracks Regional Council Complex |
Chattogram Hill Tracts Affairs |
02-03-2019 |
30-06-2024 |
162 |
Construction of Parjatan Bhaban at Shere-e-Bangla Nagar, Agargaon |
Civil Aviation and Tourism |
07-01-2017 |
01-01-1970 |
163 |
Construction of Bhumi Bhaban Complex (1st RDPP) |
Land |
07-07-2015 |
31-12-2020 |
164 |
Vertical Extension of Administration Center (LATC) from 5th to 11th Floor |
Land |
07-01-2016 |
31-12-2019 |
165 |
Construction of Upazilla and Union Land office (6th stage) (1st RDPP) |
Land |
07-01-2014 |
01-01-1970 |
166 |
Project Req from kishorganj to pd3 |
Land |
01-09-2020 |
30-09-2020 |
167 |
Construction of new female hostels in Nilkhet, and development of working women hostels in different districts of the country |
Women and Children Affairs |
01-07-2017 |
30-06-2020 |
168 |
Vertical Extension of Working Women Hostels Located at Mirpur & Khilgaon in Dhaka (01/07/2016 - 30/06/2019) |
Women and Children Affairs |
01-07-2016 |
30-06-2019 |
169 |
Establishment of Vocational Training Centre and Hostel at Sonaimuri, Kaligong, Araihazar & Modhbaria Upazilla. |
Women and Children Affairs |
01-07-2014 |
30-06-2019 |
170 |
Construction of Joyeeta Tower ( 1st Revision ) |
Women and Children Affairs |
22-07-2018 |
31-12-2023 |
171 |
Construction of " Women training center cum Hostel " at Shivchar in Madaripur . |
Women and Children Affairs |
01-07-2020 |
30-06-2024 |
172 |
Marine Fisheries Research Strengthening and Infrastructure Development Projcet |
Fisheries and Livestock |
01-07-2017 |
30-06-2021 |
173 |
Strengthening of Department of Livestock
|
Fisheries and Livestock |
01-01-2020 |
30-06-2024 |
174 |
Strengthening of Bangladesh Institute of Management Dhaka |
Industries |
04-01-2018 |
30-06-2021 |
175 |
Construction of Woman Hostal of BITAC Chittagnog Khulna and Bagura |
Industries |
07-01-2018 |
01-01-1970 |
176 |
Modernization of BSTI Regional Offices at Chattogram and Khulna |
Industries |
07-01-2015 |
01-01-1970 |
177 |
Establishment of Tool Institute with testing Facilities to Strengthen BITAC |
Industries |
01-01-2016 |
01-01-1970 |
178 |
Establishment of National Gene Bank |
Science and Technology |
01-03-2018 |
30-06-2021 |
179 |
Construction of Rooppur Nuclear Power Plant (Main Phase) (01/07/2016- 30/12/2025) |
Science and Technology |
01-07-2016 |
31-12-2025 |
180 |
Bangladesh Oceanographic Research Institute |
Science and Technology |
01-04-2022 |
31-03-2025 |
181 |
Construction of Bangladesh Copyright Bhaban |
Cultural Affairs |
07-01-2016 |
01-01-1970 |
182 |
Construction of Building for 1971: Genocide-Torture Archive & Museum |
Cultural Affairs |
01-01-2019 |
01-01-1970 |
183 |
Extension of Museum Building and construction of other Physical Infrastructure of the Bangladesh Folk Art & Crafts Foundation |
Cultural Affairs |
01-01-2019 |
01-01-1970 |
184 |
Construction of Shailajaranjan Cultural Center at Mohanganj Upazila |
Cultural Affairs |
01-09-2018 |
30-06-2020 |
185 |
Construction of Administration Training Center , Guest House and Dormitory Building at Manipuri Lalitakala Academy |
Cultural Affairs |
01-07-2017 |
30-06-2020 |
186 |
Construction of Divisional and Zila Shipakala Academies |
Cultural Affairs |
01-05-2014 |
30-06-2020 |
187 |
Structural Development of Khagrachari Khudra Nreegoshtir Sangskritute |
Cultural Affairs |
07-01-2016 |
01-01-1970 |
188 |
Establishment of 40 (forty) Technical Training Centre (TTC) at Upazila level and 1 (One) Institute of Marine Technology (IMT) at Chattogram |
Expatriates' Welfare & Overseas Employment |
01-01-2016 |
30-06-2022 |
189 |
Establishment of Dhaka Technical Teachers Training Institute (DTTTI) |
Expatriates' Welfare & Overseas Employment |
07-01-2016 |
01-01-1970 |
190 |
Capacity Development Program of TTC, Rajshahi |
Expatriates' Welfare & Overseas Employment |
01-01-2016 |
01-01-1970 |
191 |
Strengthening and Modernization of Apprenticeship Training Offices at Dhaka, Chittagong and Khulna |
Expatriates' Welfare & Overseas Employment |
07-01-2018 |
30-06-2021 |
192 |
Establishment of Four Marine Academy in Bangladesh (Pabna, Barishal, Sylhet & Rangpur |
Shipping |
07-01-2012 |
01-01-1970 |
193 |
Construction of Head office Building of Bangladesh Land Port Authority at Sher-e-Banglanagar |
Shipping |
07-01-2016 |
01-01-1970 |
194 |
Construction of Revenue Building (01/07/2009 - 30/06/2019)-approved |
Internal Resources Division |
01-07-2009 |
31-12-2019 |