PWD Building Database Related Documents

Executive Engineer's Office, Public Works Moulvibazar

Building Code: SHLMLB0013
Founded In: 1966
Type of Usage: Office
Type of Building: Ripe(Frame Structure)
Allowable Floors: 3
Existing Number of Floors: 3
Plinth Area of Main building: 9900.7 Square Feet
GPS Location: 24.486567 N 91.772873 E
Yearly Expenditure: 748318.98 (In Lac)
Maintained By :

A PHP Error was encountered

Severity: Notice

Message: Undefined variable: conn

Filename: views/buildingbyid.php

Line Number: 49

A PHP Error was encountered

Severity: Warning

Message: mysqli_query() expects parameter 1 to be mysqli, null given

Filename: views/buildingbyid.php

Line Number: 49

A PHP Error was encountered

Severity: Notice

Message: Undefined variable: conn

Filename: views/buildingbyid.php

Line Number: 49

A PHP Error was encountered

Severity: Warning

Message: mysqli_error() expects parameter 1 to be mysqli, null given

Filename: views/buildingbyid.php

Line Number: 49